GRP Access Structures for Barcaldine Hatchery

Dura-Composites_Access-Structure

Dura Composites designed and supplied a challenging set of two GRP (glass reinforced polymer) access structures for Barcaldine Hatchery – one at the Vacuum Waste and the other at the On-Growing RAS – each addressing critical safety and access needs for sensor maintenance and cleaning.

The access structures were required to maintain adequate headroom, using top-mounted structural support to ensure unimpeded access for personnel below.

Central overhead up-and-over supports were tailored to the project’s unique specifications. The results were two safe and reliable GRP chemically-resistant platforms with guaranteed longevity and anti-slip, non-corrosive and non-conductive properties.

Learn more at www.duracomposites.com/project/barcaldine-hatchery-argyll-uk/ 

Dura Composites logo

 

Author

Keep up with us

Fish Farmer April 2024 cover

The April 2024 issue of Fish Farmer magazine is out now online